MENU

Hunan Changsha MXL-150D2 Foundation Anchor Slope Support

2026-04-09 09:27:55 超级管理员 Engineering Case 43 views

Location: Hunan Province

Location: Changsha City

Drill Model: Anman MXL-150D2 Foundation Anchor Drill

Drilling Configuration: 73 drill rods

Method Type: Slope Support

Geological Conditions: Strong wind erosion (1-31 meters)

Drilling Angle (°): 10

Pile diameter (mm): 150

Pile depth (m): 31

Construction Efficiency (min): 100

Pure Drilling Time (min): 50

Pure Disassembly Drill Time (min): 30



Slope support construction with MXL-150D2 anchor drill in Hunan10-degree angle foundation anchor drilling with MXL-150D2 rigMXL-150D2 anchor drill working on wind-eroded soil slope


Drilling Technology

1. Move the drill rig to the drilling location, adjust the angle to 10 degrees, and extend the leg to touch the ground (try to get both tracks and legs in contact), align with the drilling location;

2. First install a drill pipe, then attach the drill bit, place a wooden board at the mouth of the hole, start up the main machine. Use a gripper to position the drill pipe, rotate it with compressed air until it reaches the correct position, pay attention to the speed while drilling and observe the sedimentation situation;

3. Continuously operate the drill pipe to reach the required depth, pay attention to the side cleaning of the hole, do not wait until the end to clear out the sediment; 

4. Remove the drill pipe;

5. Withdraw the leg and move the drill rig to the next drilling location.