MENU

Dubai Flat-Plate Photovoltaic Drill Rig Construction Technique

2026-04-08 14:03:38 超级管理员 Engineering Case 85 views


Location (Province): United Arab Emirates

Location (City): Dubai

Drill Rig Model: MXL-150DC Multi-functional Drill Rig

Drilling Tool Configuration: Spiral drill pipe (1.5 meters per rod)

Construction Technique: 80-degree inclined hole

Geological Conditions: 0-4 meters sandy soil, 4-6 meters sandstone.

Construction Angle (°): 80

Pole diameter (mm): 250

Hole depth (m): 6 meters

Overall drilling efficiency: 40 minutes per hole

Equipment average hourly oil consumption: 6L/H

Translation:

Location (State): United Arab Emirates

Location (City): Dubai

Drill Rig Model: MXL-150DC Multi-functional Drill Rig

Drilling Tool Configuration: Spiral drill pipe, 1.5 meters per rod

Construction Technique: 80-degree inclined hole drilling

Geological Conditions: Sandy soil from 0 to 4 meters, sandstone from 4 to 6 meters.

Construction Angle (°): 80

Pole diameter (mm): 250

Hole depth (m): 6 meters

Overall drilling efficiency: 40 minutes per hole

Equipment average hourly oil consumption: 6 liters per hour


MXL-150DC multi-functional drill rig working at Dubai desert siteWorkers with MXL-150DC drill rig at construction site in DubaiMXL-150DC drill performing inclined hole drilling in Dubai desert

Configuration: One MXL-150DC Multi-functional Drill Rig unit

Step-by-step procedure and parameters:

1. Position the drill rig at the designated drilling location.

2. Connect the spiral drill pipe correctly.

3. Adjust the mast through the variable angle mechanism to 80°, with four legs supporting the ground to increase the stability of the drill rig.

4. Start drilling at a uniform speed, connecting the spiral drill pipe as needed, until the drill pipe reaches a depth of 6 meters and stops.

5. Lift and disassemble the spiral drill pipe, except for the last three sections, which can be lifted off the ground.

6. Complete drilling, then move the drill rig to the next location.