Philippines Geothermal Mountain Drill Rig

2026-03-04 10:10:02 超级管理员 Engineering Case 79 views

Drill Rig Model: AGL-460G Geothermal Drill Rig

Drilling Tool Configuration: Screw drill pipe (1.2 meters per rod)

Construction Method: Vertical construction, with a reserved 200mm installation location.

Geological Conditions: 0-1 meter soil layer

Construction Angle (°): 90

Pipe diameter (mm): 100

Hole depth (m): 1 meter

Overall drilling efficiency: 20 minutes

Equipment average hourly fuel consumption: 6L/H

AGL-460G geothermal drill rig working at slope construction siteGeothermal drilling with AGL-460G rig in mountainous areaAGL-460G geothermal drill rig performing vertical drilling on hillside

AGL-460G Mountain Solar Drilling Machine's Process Steps and Parameters:

1. Adjust the drilling machine to a horizontal position according to the terrain slope, and then align it with the designated point.

2. Take one screw rod, place it at the center of the point, connect the output end of the power head to the screw rod, and fix its position using a positioning bolt.

3. Adjust the rod's front-rear and left-right angles to 90°.

4. Start drilling uniformly at high speed until the screw rod is drilled to a remaining depth of 200mm and stop.

5. Lift the power head away from the screw rod, remove the positioning bolt from the screw rod, and take it down.

6. Drilling completed, move the machine slightly below the point.