Wuxi, Jiangsu – SJL-120 Rotary Jet Grouting Cut-off Wall – MJS Method – Subway Project
Location (Province): Jiangsu
Location (City): Wuxi
Drill Model: SJL-120 Rotary Jet Drill Rig
Drill Tooling: Ammann 142 series multi-hole drill bit, drill pipe, swivel
Process Type: Rotary jet grouting cut-off (water stop)
Construction Method: MJS Method
Stratum Conditions: 1-4m backfill layer, 4-20m clay layer
Construction Angle (°): 90
Pile Diameter (mm): 2000
Hole Depth (m): 20
Construction Method
Equipment Configuration:
One Ammann SJL-120 drill rig
Backup Configuration:
One 230 high-pressure pump
One 165 high-pressure pump
One 90E high-pressure pump
One 9m³ air compressor
Nozzle Size: 2.8
![]() | ![]() | ![]() |
1. Mark the position of each pile according to requirements.
2. Use a pilot drill rig with a 280mm bit. Control the penetration rate to prevent deviation. After reaching the
required depth, disassemble the drill pipe.
3. Install the bit on the SJL-120 drill rig (clamp it tightly). Align with the hole position as required, adjust verticality,
and extend the supports.
4. Check the high-pressure pumps, mixing plant, air compressor, nozzles, flowmeter, pressure sensors, data
transmission terminal, receiver module on the rig, display, and data recording to ensure everything is functioning
properly.
5. Seal the grouting nozzle and cutting water nozzle with transparent tape. Assemble the drill pipe sections (check
the sealing rings when connecting). Finally, install the swivel.
Ammann engineer on-site guidance.
6. Start the air compressor, high-pressure pumps, and mixing plant. Set the 230 high-pressure pump pressure to
40MPa, the 90E pump suction pressure to 15MPa, and air pressure to 1.0MPa. Use 360° swing grouting with a
rotation speed of 6r/min and a step feed rate of 30mm/min. Monitor rotation pressure changes and slurry return
during construction. After disassembling the drill pipe, clean it promptly to prevent nozzle blockage.